Electrical Connection; Air Inlet And Exhaust Connection; Steam Connection; Gas Connection - Miele PT 8251 + COP Operating Instructions Manual

Hide thumbs Also See for PT 8251 + COP:
Table of Contents

Advertisement

Installation and connection

Electrical connection

The electrical components of this machine comply
with IEC 335-1 and IEC 335-2-11.
The electrical connection may only be carried out by
a suitably qualified technician in accordance with
local and national safety regulations (BS 7671 in the
UK).
Please observe the wiring diagram supplied.
Please ensure that the voltage and frequency of the
machine as quoted on the data plate comply with the
on-site supply.
Connection should be made via a suitable isolator
which complies with local and national safety regula-
tions and which is easily accesible for disconnecting
the machine from the electricity supply. Provision
must be made on site to switch off all poles. Switches
with a minimum all-pole contact gap greater than 3
mm are suitable for isolating the machine. These in-
clude circuit breakers, fuses and relays (IEC/EN
60947).
If the machine is disconnected from the electricity
supply ensure adequate measures are taken to
ensure that the machine cannot be reconnected to
the electricity supply until all work has been carried
out.
After the machine has been connected to the
electricity check the phase rotations on the incoming
power supply to the appliance.
Equipotential bonding
Equipotential bonding must be carried out if required.

Air inlet and exhaust connection

This tumble dryer must only be used when it is
connected to a suitable ducting system. The
installation site must be adequately ventilated. See
the installation instructions supplied.

Steam connection

Steam connection must only be carried out by an
authorised installer.
See installation instructions supplied with the
machine.
A steam valve and condensate trap are available to
order from your Miele Dealer or the Miele Spare Parts
Department.
22

Gas connection

This work must be carried out by an
authorised person in accordance with
local and national safety regulations.
This must be a Gas Safe registered
technician in the UK. See the
installation instructions supplied.
,
The earth lead (N) and phase conductor (L)
must be connected to the correct connectors.
Take care not to connect them the wrong way
round!
The gas group to which the machine has been set at
the factory is given on the Gas Data label on the rear
of the machine.
If the machine is converted for a different gas group,
or to liquid gas, a conversion kit is required. This is
available from the Spare Parts Department. When
ordering please quote the model and serial number
of the machine, as well as the gas type, group and
connection pressure in the country of installation.
Please follow the installation instructions carefully. To
ensure safety, any conversion work must only be
carried out by an authorised technician, e.g. Gas
Safe registered in the UK.
,
Do not attempt to repair or work on gas-heated
machines yourself. Repairs must only be carried
out by an authorised technician to ensure safety.
In the event of a fault please contact the Miele Ser-
vice Department.
,
After setting up and connecting the machine,
ensure that all outer casing parts are correctly fit-
ted back into position.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt 8331 + copPt 8251Pt 8331

Table of Contents