Warnings
Warnings
Read all installation instructions and site survey reports, and verify correct equipment
●
installation before connecting the Access Point.
Verify any device connected to this unit is properly wired and grounded.
●
Verify there is adequate ventilation around the device, and ambient temperatures meet
●
equipment operation specifications.
Site Preparation
Consult your site survey and network analysis to determine specific equipment
●
placement, power drops etc.
Assign installation responsibility to the appropriate personnel.
●
Identify and document where all installed components are located.
●
Ensure adequate, dust-free ventilation to all installed equipment.
●
Prepare Ethernet port connections.
●
Verify cabling is within the maximum 100 meter allowable length.
●
Package Contents
The Access Point ships with the following:
One Altitude 4521 Series Access Point
●
Installation Guide (This Guide)
●
Rubber Wall Mount Spacers (4)
●
LED light pipe and badge
●
Wall mount screw and anchor kit
●
Altitude™ 4521 Series Access Point Installation Guide
7