C
HECKING FOR
L
EAKS
3-12
I
NSTALLATION
Before placing the Chiller into operation you need to check
for fluid leaks. Do this by turning on the pump from the con-
trol and letting it run while you check inside the chiller.
From the main screen:
1
Press the Run arrow on the screen.
STATUS
SETUP RUN ALM
2
Press the Scroll arrows to scroll
to the Manual Pump screen.
The Manual Pump screen displays:
Manual Pump
3
Press the Pump ON arrow.
Check inside the chiller for any leaks.
If you find leaks:
1
Press the Stop Chiller button on the
control panel.
2
Press the Manual Pump OFF arrow.
3
Disconnect the Chiller from the
main power supply.
4
Repair any leaks.
Dry any moisture inside the Chiller.
5
Reconnect the main power supply.
Series 1 Portable Chillers, PLC Control
press arrow
ON OFF
UGH017/0500