Installation And Set Up Power Requirements; Connecting Power; Connecting To The Dmx512 Network - Philips Selecon PL3 LED Luminaires Installation & User Manual

Table of Contents

Advertisement

PL3 LED Luminaires
INSTALLATION AND SET UP
1. Power Requirements
The PL3 LED Luminaire operates on 120 to 240 volts AC (+/- 10%, auto-ranging). The luminaire contains an auto-
ranging power supply. Depending on supply voltage, each luminaire can draw up to 4.60 amps.

2. Connecting Power

If the unit is supplied with an AC input cable (PL3BE), Table 1 describes how to connect power to your PL3 LED
Luminaire. Field wiring of the PL3 LED Luminaire is straight forward. A total of 3 wires/conductors need to be
brought to the unit. For detailed power specifications, see
following wiring scheme is required:

3. Connecting to the DMX512 Network

Basic DMX512 installation consists of connecting multiple PL3 LED Luminaires together in "daisy-chain" fashion.
A cable runs from the control console (or DMX512 control source) to the DMX connector on the first PL3 LED
Luminaire. Another cable runs from the other DMX connector on the first unit to a DMX connector on the next PL3
LED Luminaire (or DMX512 device to be controlled).
Note: For more information on DMX512 networking and systems, refer to
page
1. For PL3 LED Luminaire DMX Mapping, refer to
PL3 LED Luminaires
DMX512
(from console or
control device)
Table 1: PL3 LED Luminaire AC Input Connections
Wire Color
Brown
Blue
Green/Yellow
"DMX CONTROL" on page
DMX512
(out from first
to second luminaire)
Installation & User's Manual
"PL3 LED Luminaire Specifications" on page
Purpose
Main / Line (120 to 240VAC)
Neutral
Ground / Earth
"Additional Resources for DMX512" on
16.
DMX512
(out to the next luminaire or
DMX512 controlled device)
DMX512 Connections
DMX512 Signal
Common (Drain)
DMX512 -
DMX512 +
Note: Remaining pins on each connector are not used.
33. The
XLR Pin
1
2
3
5
Power Requirements

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents