Condensate Drainage - Keston Qudos 37 User's Installation Manual

Fan powered high efficiency modulating domestic condensing gas boiler
Table of Contents

Advertisement

WD500
a
b
c
Always thoroughly deburr all pipes and, most important, remove shavings from
within the pipe.
d
e
f
g
h
Note:
It is equally important to seal the air inlet with solvent cement as the flue outlet
pipe joints.
4.5

CONDENSATE DRAINAGE

NB:
When installing the boiler, consider:
Condensate Trap Assembly
The condensate trap is fitted loose inside the cabinet.
Connect the condensate drainage system to the boiler. It is advisable to use a detachable
fitting at connection to the boiler to enable easy removal for servicing.
Fill the condensate trap by pouring water into the boiler flue until water is seen to flow
freely from the condensate drainage system. Make the final connection of flue pipe to the
boiler.
Details are provided in Chapter 3 - Section 3.11 Condensate Drainage
Connection :
4.6
WATER SYSTEM
Connect the flow and return HEATING CIRCUIT system pipework to the boiler. Details of
system requirements are given in Chapter 3 - Section 3.7 Water Systems.
Connections
Installation & Servicing Instructions
Chapter 4 : Installation
Using the template supplied within the boiler packaging mark the
positions of the two holes for the flue and air pipes on the wall(s) or
ceiling.
Drill the two holes in the wall/ceiling, preferably using a core drill.
Measure, cut and check the air and flue pipes to pass to the exit from the
wall(s) or ceiling.
Mount the boiler on the wall bracket and fix the air spigot (packed loose
with the boiler and with appropriate gasket) to the boiler air inlet
connection tightly to ensure there is no leakage. Assemble, using
adhesive, the pipework from the boiler connections to the exit from the
first wall/ceiling (remount the boiler if removed). When pushing pipe
through walls, ensure grit and dust is not allowed to enter the pipe.
Ensure pipes are fully engaged into sockets and solvent welded with no
leaks.
Using the same methods drill any further holes (always covering existing
pipework), cut and assemble the pipework.
From outside, complete the two terminations - See Section 3.8 Flue
System and make good all holes. (wall sealing collars are available to
make good hole areas on the wall face (part number C.08.0.00.07.0)
Support any pipes whose route could be displaced either of its own
accord or by accident. Any horizontal run over 1m or vertical runs of any
length must always be supported. Brackets should be placed at intervals
of approximately 1m.
Check all connections for security and re-seal any joints using solvent
cement where soundness may be in doubt.
i)
remove the nut from the condensate trap spigot;
ii)
fit the condensate trap through the two holes in the bottom of the
frame;
iii)
replace the nut from the frame bottom
22 mm plastic pipe.
: 1 inch BSPM
The Keston Q37 & Q37P Boilers
Page : 23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qudos 37p

Table of Contents