Mitsubishi Electric FR-E5NC Instruction Manual page 21

Transistorized inverter
Table of Contents

Advertisement

(2) Operation mode switching method
Change the operation mode as described below:
Symbol
PU operation → External operation
A
External operation → PU operation
B
External operation → CC-Link operation
C
CC-Link operation → External operation
D
PU operation → CC-Link operation
E
CC-Link operation → PU operation
F
When "1" is set in Pr. 340 "link start mode selection", the operation mode is CC-Link operation at power on or inverter
reset.
Note: 1. When setting "1" in Pr. 340, the initial settings (station number setting, etc.) of the inverter must be made
without fail.
2. In the switch-over mode (Pr. 79 = 6), switching in E and F is allowed.
Switched by
PC program
C
CC-Link
D
Switching Type
Switched
from PU
A
External
PU operation
operation
B
E
F
(Switching disallowed)
Switching Method
Operate the external operation key on the PU.
Operate the PU operation key on the PU.
By the user program of the PLC.
By the user program of the PLC.
Switching disallowed. Allowed if external operation is selected in A
and CC-Link operation is then selected in C. (Note 2)
Switching disallowed. Allowed if external operation is selected in D
and PU operation is then selected in B. (Note 2)
13
INVERTER SETTING

Advertisement

Table of Contents
loading

Table of Contents