Download Print this page

Perlick 63134-1 Installation And Operation Instructions Manual

Beer pump panel system

Advertisement

Quick Links

INSTALLATION AND OPERATION INSTRUCTIONS
BEER PUMP PANELS
IMPORTANT INFORMATION
This manual has been prepared to assist you in the
operation of Perlick Beer Pump Panel System.
We dedicate considerable time to ensure that our
products provide the highest level of customer
satisfaction. If service is required, your dealer can
provide you with a list of qualified service agents. For
your own protection, never return merchandise for
credit without our approval.
We thank you for selecting a Perlick product and
assure you of our continuing interest in your
satisfaction.
8300 West Good Hope Road • Milwaukee, WI 53223 • Phone 414-353-7060 • Fax 414-353-7069
Toll Free 800-558-5592 • E-Mail: Perlick@Perlick.com • www.Perlick.com
MODEL NO.
63134-1
63134-2
63134-3
63134-4

Table of Contents

Installing the Panel ..............................................2
Panel Diagram .....................................................3
How to Operate the Beer Panel...........................4
Beer Pump Diagram ............................................5
Cleaning Diagram ................................................6
Cleaning Instructions ...........................................7
Replacement Parts ..............................................7

Advertisement

loading

Summary of Contents for Perlick 63134-1

  • Page 1: Table Of Contents

    Winterizing a System with Beer Pumps....7 credit without our approval. Replacement Parts ..........7 We thank you for selecting a Perlick product and assure you of our continuing interest in your satisfaction. 8300 West Good Hope Road • Milwaukee, WI 53223 • Phone 414-353-7060 • Fax 414-353-7069...
  • Page 2: Installing The Panel

    CAUTION: IF USING CO AS A PRESSURE SUPPLY FOR PUMPS, PUMP EXHAUST MUST BE VENTED TO A WELL VENTILATED AREA TO AVOID POSSIBLE ASPHYXIATION. Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
  • Page 3: Panel Diagram

    Diagram – Beer Pump Panel Diagram Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
  • Page 4: How To Operate The Beer Panel

    10 psig. Smart Coupler Probe Valve Lever Positions Figure 1 Figure 3 Figure 2 Closed Position Open Position 45° or Cleaning Position Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
  • Page 5: Beer Pump Diagram

    Diagram #2 – Beer Pump Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
  • Page 6: Cleaning Diagram

    Diagram #3 – Cleaning Diagram Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
  • Page 7: Cleaning Instructions

    Rinse the lines using clean cold water (Ensure all line cleaning solution has been removed from the lines to prevent hazardous results). Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
  • Page 8 8300 West Good Hope Road • Milwaukee, WI 53223 • Phone 414-353-7060 • Fax 414-353-7069 Toll Free 800-558-5592 • E-Mail: Perlick@Perlick.com • www.Perlick.com Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2149A...

This manual is also suitable for:

63134-363134-463134-2