Sharp XG-V10WU Service Manual page 26

Lcd projector
Hide thumbs Also See for XG-V10WU:
Table of Contents

Advertisement

XG-V10WU
AN-SD1U/S422U
Replacing the LCDs
Remove the top cover.
(1) Remove the six screws off the relay duct and disconnect the relay duct.
(2) Remove the two screws off the upper suction cover and detach this cover.
(3) Disconnect the LCD flat cable from the PWB connector.
(4) Place the set in the ceiling-mounted position and open the maintenance door.
(5) Remove the lock screws "b" and "c". Take out the LCD-equipped R/B adjusting board and G adjusting board.
(6) Detach the LCD panel from the adjusting board.
(7) Place a replacement LCD panel and take the above steps (1) thru (5) in the reverse order.
~ Keep in mind that the G LCD panel does not need convergence readjustment and that it has a small adjustable
range in the Z direction.
BOTTOM VIEW
FRONT
Lock
screws "b"
5
Lock
screws "c"
SIDE VIEW
R·B-LCD
TOP
R-LCD
5
Z
B-LCD
θY
R·B adjusting plate
Y
X
θZ
5
Lock
screws "c"
G-LCD
`
Lock
5
X
screws "c"
SIDE VIEW
6
R·B-LCD panel
mounting screws
26
G adjusting plate
G-LCD
G-LCD panel
6
mounting screws
TOP

Advertisement

Table of Contents
loading

This manual is also suitable for:

An-sd1uAn-s422u

Table of Contents