VKI Technologies Zuma Brewer Operation And Service Manual page 22

Hide thumbs Also See for Zuma Brewer:
Table of Contents

Advertisement

Zuma Brewer - Operation & Service Guide
3. Remove the coupling pin at the back of the brewer. This pin is tapered and press-fit into the shaft -
tap the longer end of the pin with a hammer until it pops out of the shaft (
remove the c-clip securing the crank arm shaft to the mainframe (
4. Remove the c-clip at the rear of the crank arm (
frees the piston rod from the crank arm.
5. Move the piston rod away from the front of the crank arm (
cylinder down and gently tap the crank arm shaft with a hammer (
these two components are press-fit together
Page 22
), and then remove the crank arm pin (
). Once the pin is out,
).
). Place the brewer on the table with the
) to unlock it from the triple cam -
). This

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for VKI Technologies Zuma Brewer

Table of Contents