Seismic Restraint; Fixing To Timber Floor Framing - Ecotec Amalfi Owners & Installation Manual

Wood pellet burning heater
Table of Contents

Advertisement

2.9.4
Hydraulic plant Thermostove for heating
This diagram is given as an indication only. Installation must be carried out by a plumber.
2.10

Seismic Restraint

All installation scenarios for Amalfi require the use of hold-down anchors (one on each side).
Fixing to Concrete Floor:
Minimum M8 expansion anchors (M10 recommended) or min M8 epoxy- set anchors.
Approved Anchors: Expansion Anchors-Ramset Dynabolt and Trubolt, Hilti HAS.
Epoxy-set Anchors – Ramset Epcon, Ramset Chemset and Hilti HVU.
2.11

Fixing to Timber Floor Framing

Minimum 14g x 60 screws (6.3mm diameter) or M10 X 90 coach-screws. These shall be fixed a minimum
of 40mm into the centre-line of the existing floor joists. If screws cannot be installed directly into an
existing floor joist, solid blocking between joists (min size 90x45) shall be provided.
Figure 27.
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents