Pioneer SGY-PM910H Installation Manual page 33

Pedaling monitor sensor
Hide thumbs Also See for SGY-PM910H:
Table of Contents

Advertisement

4
Insert the chainring bolts into the bolt holes and temporarily install the chainring adapter on the
chainring.
Do not tighten the chainring bolts too tightly when you temporarily tighten them.
5
Press on the chainring in a clockwise direction to eliminate any play as you tighten the chainring bolts
to the specified torque.
Tighten the chainring bolts in order in a kitty-corner pattern.
Tightening torque: 14 N•m
Refer to the instruction manual for the crank set you are using for the torque at which to tighten the chainring bolts.
Periodically inspect and re-torque the bolts on the chainring.
6
Install the right transmitter on the chainring adapter with the 8-mm screws provided.
Check that the right transmitter is installed so it lines up with the chainring.
Press on the right transmitter from the outer side of the outer chainring as you insert the 3 screws, then tighten them to the
specified torque.
Use a tool to measure the torque when you tighten the screws.
Tightening torque: 30 cN•m
This completes the installation of the sensors on the right crank set.
Assembling the Chainring and Installing the Right Transmitter
EN
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents