Safe Handling - IDEAL HE15 Installation And Servicing

Mexico he
Table of Contents

Advertisement

OpERATION
When there is a demand for heat, the heating system is supplied
at the selected temperature of between 30
The boiler features a comprehensive diagnostic system which
gives detailed information on the boiler status when operating, and
performance of key components to aid commissioning and fault finding.

sAFE hANDLINg

This boiler may require 2 or more operatives to move it to its
installation site, remove it from its packaging base and during
movement into its installation location. Manoeuvring the boiler
may include the use of a sack truck and involve lifting, pushing
and pulling.
Caution should be exercised during these operations.
Operatives should be knowledgeable in handling techniques when
performing these tasks and the following precautions should be
considered:
Grip the boiler at the base.
Be physically capable.
Use PPE as appropriate, e.g. gloves, safety footwear.
During all manoeuvres and handling actions, every attempt should
be made to ensure the following unless unavoidable and/or the
weight is light.
Keep back straight.
Avoid twisting at the waist.
Avoid upper body/top heavy bending.
Always grip with the palm of the hand.
Use designated hand holds.
Keep load as close to the body as possible.
Always use assistance if required.
OpTIONAL ExTRA KITs
FLUINg:
 Flue Extension Ducts.
HE15, 18 & 24 -up to 6m
HE30, & 36 - up to 3m
 90
Elbow Kit (60/100 dia maximum no. per installation)
o
HE15, 18 & 24 -up to 4 elbows
HE30, & 36 - up to 2 elbows
 45
Elbow Kit (60/100 dia maximum no. per installation)
o
HE15, 18 & 24 -up to 4 elbows
HE30, & 36 - up to 2 elbows
 Concentric Flue screw Retaining Kit
 Roof Flue Kit (60/100)
HE15, 18 & 24 -up to a maximum of 8m
HE30, & 36 -up to a maximum of 5m
 pitched Roof Tile (for roof flue kit)
 Flat Roof Tile (for roof flue kit)
 Vertical Flue Adaptor
 Vertical Outlet Flue Kit with Elbow (60/100)
HE15, 18 & 24 - to a maximum length of 6m
HE30, & 36 - to a maximum length of 3m
 Flue Finishing Kit
 high Level Flue Outlet Kit
 Flue Deflector Kit
OThER OpTIONAL KITs:
 Remote User Control Kit
 Condensate pump Kit
 Concealment panel Kit
 Rs Boiler Terminal Wall plate Kit
 Adjustable Flue support Bracket
mexico HE -
Installation & Servicing
General
C and 82
C.
o
o
(1000mm long)
sAFETy
Current gas safety (Installation and Use) Regulations or
rules in force.
The appliance is suitable only for installation in GB and IE and
should be installed in accordance with the rules in force.
In GB, the installation must be carried out by a Gas Safe
Registered Engineer. It must be carried out in accordance with
the relevant requirements of the:
Gas Safety (Installation and Use) Regulations
The appropriate Building Regulations either The Building
Regulations, The Building Regulations (Scotland), Building
Regulations (northern Ireland).
The Water Fittings Regulations or Water bye-laws in Scotland.
The Current I.E.E. Wiring Regulations.
Where no specific instructions are given, reference should be
made to the relevant British Standard Code of Practice.
In IE, the installation must be carried out by a Registered Gas
Installer and installed in accordance with the current edition
of I.S.813 "Domestic Gas Installations", the current Building
Regulations and reference should be made to the current ETCI
rules for electrical installation.
Detailed recommendations are contained in the following British
Standard Codes of Practice:
Bs. 5440:1
Flues (for gas appliances of rated input not
exceeding 70 kW).
Bs. 5440:2
Ventilation (for gas appliances of rated input not
exceeding 70 kW).
Bs. 5449
Forced circulation hot water systems.
BsEN. 12828:2003 Heating Systems in buildings: Design for
water based heating systems.
BsEN 12831:2003 Heating Systems in buildings: Method for
calculation of the design heat load.
BsEN 14336:2004
Heating Systems in buildings: Installation
and commissioning of water based heating
systems.
Bs. 5546
Installation of gas hot water supplies for domestic
purposes (2nd Family Gases).
Bs. 6798
Installation of gas fired hot water boilers of rated
input not exceeding 60 kW.
Bs. 6891
Low pressure installation pipes.
health & safety Document No. 635
The Electricity at Work Regulations, 1989.
The manufacturer's notes must NOT be taken, in any way, as
overriding statutory obligations.
IMpORTANT. These appliances are CE certificated for safety
and performance. It is, therefore, important that no external
control devices, e.g. flue dampers, economisers etc., are
directly connected to these appliances unless covered by
these Installation and Servicing Instructions or as otherwise
recommended by Ideal Boilers in writing. If in doubt please
enquire.
Any direct connection of a control device not approved by Ideal
Boilers may invalidate the certification and the normal appliance
warranty. It could also infringe the Gas Safety Regulations and
the above regulations.
sAFE hANDLINg OF sUBsTANCEs
Care should be taken when handling the boiler insulation panels,
which can cause irritation to the skin. No asbestos, mercury or
CFCs are included in any part of the boiler or its manufacture.
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mexico he18He24Mexico he30He36Mexico he24Mexico he36

Table of Contents