Gas Connection; Boiler Water Connections - IDEAL HE15 Installation And Servicing

Mexico he
Table of Contents

Advertisement

14 FLUE hOLE TEMpLATE
IMpORTANT. Ensure that, during the cutting
operation, masonry falling outside of the building
does not cause damage or personal injury.
Note.
The template shows the position of the flue hole
centres lines. (Flue options can be flush to wall
or in line with 600mm deep kitchen units)
1. Extend flue centre line vertically, (for rear, left
or right as appropriate), up to 690mm (centre
line of flue).
2. Mark onto the wall the position of the flue
duct hole.
3. Cut the flue hole preferably with a 125mm
(5") coreboring tool, ensuring that the hole is
square to the wall.
4. Remove the template from the floor.

15 gAs CONNECTION

gAs CONNECTION
The boiler gas connection is built into the pre-piping
frame.
IMpORTANT. the gas service cock is sealed with a non-
metallic fibre washer seal so must not be overheated
when making capillary connections.

16 BOILER WATER CONNECTIONs

The boiler flow and return connections are built into the pre-piping frame.
Note.
For heating loads in excess of 60 000 Btu/h use 28mm x 22mm
connectors to connect the boiler flow and return pipes to 28mm.
If flow and return pipes are required to run behind the boiler, this can be
facilitated by fitting the boiler in line with the front of 600mm deep kitchen
units thus creating a 70mm space behind the boiler.
16
InstallatIon
127mm (5") dia.
flue hole
690mm
(27
1
/
")
4
Refer to Fame 1 for details of the position of the gas
connection.
Ensure that the gas supply pipe does not foul the boiler
casing.
Refer to Frame 40 for details of the pressure test point
position.
C for boiler pushed
L
back to wall
Note. If only the terminal pack
'B' is used (up to 775mm) no flue
incline is required.
mexico HE -
Installation & Servicing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mexico he18He24Mexico he30He36Mexico he24Mexico he36

Table of Contents