41 gENERAL ChECKs
Make the following checks for correct operation:
1. Central heating
The correct operation of ANy programmer and all other
system controls should be proved. Operate each control
separately and check that the main burner or circulating
pump, as the case may be, responds.
Ensure the external controls are calling for heat. After
ignition the display should read:
2. gas Rate
Operate the boiler for 10 minutes. Check the boiler gas
rate (see Table 2), ensuring the boiler is at full output whilst
measurements are recorded.
3. Water Circulation system
Knob setting
Flow Temperature
C
o
Min
30
Max
82

42 hANDINg OVER

After completing the installation and commissioning of the system the
installer should hand over to the householder by the following actions:
1. Hand the Installation / User's Instructions to the
householder and explain his or her responsibilities under
current Gas Safety (Installation and Use) Regulations or
rules in force.
2. Explain and demonstrate the lighting and shutting down
procedures.
3. The operation of the boiler and the use and adjustment
of ALL system controls should be fully explained to
the householder to ensure the greatest possible fuel
economy consistent with household requirements of both
heating and hot water consumption.
Advise the User of the precautions necessary to prevent
damage to the system and to the building in the event of
the system remaining inoperative during frosty conditions.
4. Explain the function and the use of the boiler heating
controls.
5. Explain the function of the boiler fault mode.
Emphasise that if a fault is indicated the boiler should
be turned off and a Gas Safe Registered Engineer
consulted. In IE contact a Registered Gas Installer.
as part of the commissioning process, the combustion of this appliance must be checked
and the Benchmark Checklist completed. A flow chart to assist is provided on page 55.
IT Is A CONDITION OF ThE MANUFACTURERs WARRANTy ThAT ThE
BENChMARK COMMIssIONINg ChECKLIsT Is FULLy COMpLETED
mexico HE -
Installation & Servicing
InstallatIon
4. Check the condensate drain for leaks and check that it is
5. Finally set the controls to the user's requirements.
F
o
86
The temperatures quoted alongside are approximate, and
vary between installations.
180
6. Explain and demonstrate the function of time and temperature
7. If any programmer is fitted then draw attention to the Programmer
8. After installation and commissioning please complete the
9. IMpORTANT
10. As the installer you may wish to undertake the service contract
ATTENTION !
AND LEFT WITh ThE AppLIANCE
Note. Fernox Superfloc, Sentinel X300 (new systems) / X400
(existing systems) or Salamander products flushing
solutions should be used during the flushing procedure.
Refer to Frame 9.
a.
With the system HOT examine all water connections for
soundness.
b. With the system still HOT, turn off the gas, water and
electricity supplies to the boiler and drain down to complete
the flushing process.
c.
Refill and vent the system, add inhibitor (see Frame 9),
clear all air locks and again check for water soundness.
Adhere the water treatment warning label, supplied in the
hardware pack, in a prominent position on the system, to
prevent the use of incorrect water treatment additives.
d. Balance the system. Refer to Frame 4.
discharging correctly
controls, radiator valves, etc., for the economic use of the system.
User's Instructions and hand them to the householder.
Commissioning Checklist before handover to
the customer. For IE, its is necessary to complete a "Declaration
of Conformity" to indicate compliance to I.S. 813:2002.
Stress the importance of regular servicing by a Gas Safe
Registered Engineer and that a comprehensive service should be
carried out AT LEAST ONCE A yEAR. In IE servicing work must
be carried out by a Registered Gas Installer.
yourself or alternatively offer to the customer the benefits of the
Ideal Care Scheme, details of which are outlined in the household
pack supplied with this boiler.