Raleigh Audio RAKK dac Mark III Extreme Preamplifier Assembly Manual page 33

Extreme preamplifier
Table of Contents

Advertisement

Position the Front panel
1. Tighten the KEP nut in the middle of front panel while lifting the front panel so it
contacts the tops of the mounting holes. This ensures that it's straight with respect to the
shelf it will be sitting on.
2. Secure the front panel to the side panels with four KEP nuts. Snug up these four nuts.
Now with all of the screws and nuts snug, a side panel can be moved with some force, if need be.
Position the top panel
1. Place the top panel on the top of the unit and check that the holes in the top panel are
centered over the screw holes in the side panels and back panel.
2. Adjust the side panel alignment at the front by moving the top of the side panel left or
right as is necessary to make the holes in the top panel align properly with the holes in the
side panels.
Secure the back, side and bottom panels
1. Install nine screws in the top panel. Firmly tighten these screws.
2. Firmly tighten the four screws securing the back panel to the side panels.
3. Firmly tighten the three screws securing each side panel to the bottom panel.
4. All screws should now be firmly tightened.
Secure the front panel
1. Remove the top panel.
2. Firmly tighten the four KEP nuts that are securing the front panel to the side panels.
3. Place the top panel on the top of the unit and check that the holes in the top panel are still
centered over the screw holes in the side panels and back panel.
Set the top panel aside for now. You will install it after the final electrical adjustments are made.
————————————————————————————
32

Advertisement

Table of Contents
loading

Related Products for Raleigh Audio RAKK dac Mark III Extreme Preamplifier

This manual is also suitable for:

Rakk dac mark iii

Table of Contents