2.8.7. Waste Toner Container Drive
The following is a diagram of the Waste Toner Container drive:
Power Train
1 PM Step → 2 Gear-RDCN WTB
•
2.8.8. ITB Auger Drive
The following is a diagram of the ITB Auger drive:
Power Train
1 PM Step → 2 Gear → 3 Gear
•
Copyright© 1995-2013 SAMSUNG. All rights reserved.
Step Motor & Gear-RDCN WTB : Waste Toner Container driving
ITB Auger driving
2. Product specifications and Description
2-49