Internal Leak Test; Determining The Test Volume - Buderus Logano plus GB312 Installation And Maintenance Instructions Manual

Gas condensing boiler
Table of Contents

Advertisement

9.3

Internal leak test

9.3.1

Determining the test volume

V
= V
= V
+ V
test
total
pipe
gas train
B Determine the length of pipe to the main fuel shut-off
valve.
B Determine the gas train volume (V
Tab. 19.
B Determine the pipework volume (V
and Tab. 21.
Pipework length
in metres
1
2
3
4
5
6
7
8
9
10
Tab. 20 Pipework volume (V
Pipework length
in metres
1
2
3
4
5
6
7
8
9
10
Tab. 21 Pipework volume (V
Logano plus GB312 - Subject to technical modifications.
) using
gas train
) using Tab. 20
pipe
Pipework volume (V
½
¾
0.2
0.4
0.4
0.7
0.6
1.1
0.8
1.5
1.0
1.8
1.2
2.2
1.4
2.5
1.6
2.9
1.8
3.3
2.0
3.6
) subject to pipe length and diameter
pipe
Pipework volume (V
Pipework diameter in mm (copper pipe)
15 x 1
18 x 1
0.1
0.2
0.3
0.4
0.4
0.6
0.5
0.8
0.7
1.0
0.8
1.2
0.9
1.4
1.1
1.6
1.2
1.8
1.3
2.0
) subject to pipe length and diameter
pipe
Inspection and maintenance
B Calculate the test volume (V
above equation.
Gas train volume (approximate values)
Gas train volumes up to 50 kW
Gas train volume > 50 kW
Tab. 19 Gas train volume (V
) in litres
pipe
Pipework diameter in inches
1
0.6
1.0
1.2
2.0
1.7
3.0
2.3
4.0
2.9
5.1
3.5
6.1
4.1
7.1
4.6
8.1
5.2
9.1
5.8
10.1
) in litres
pipe
22 x 1
28 x 1.5
0.3
0.5
0.6
1.0
0.9
1.5
1.3
2.0
1.6
2.5
1.9
2.9
2.2
3.4
2.5
3.9
2.8
4.4
3.1
4.9
9
) according to the
test
0.1 litres
0.2 litres
)
gas train
2
1.4
2.2
2.7
4.4
4.1
6.6
5.5
8.8
6.9
-
8.2
-
9.6
-
-
-
-
-
-
-
35 x 1.5
45 x 1.5
0.8
1.4
1.6
2.8
2.4
4.2
3.2
5.5
4.0
6.9
4.8
8.3
5.6
9.7
6.4
-
7.2
-
8.0
-
45