Commissioning
B Check the load at the RC35 programming unit or via
the service key.
Gas train boiler size 90/120 kW
B Wait until the minimum modulation range for the
corresponding boiler size (90 kW or 120 kW) has been
reached.
B Check the CO
content.
2
Insert the test probe through the test port into the core
flow inside the flue.
B At CO
values below 9.0 % or in excess of 9.6 %,
2
adjust partial load adjusting screw [1] to 9.3 %.
– Turning clockwise increases the CO
– Turning anti-clockwise reduces the CO
Fig. 37 Correct the CO
2
(boiler size 90/120 kW)
1
Partial load adjusting screw
B Recheck the CO
content and enter the value in the
2
commissioning report, Chapter 6.23.
36
content.
2
content.
2
content under partial load
Gas train boiler size 160 kW
B Wait until 25 % burner output is achieved.
B Check the CO
content.
2
Insert the test probe through the test port into the core
flow inside the flue.
B At CO
values below 9.0 % or in excess of 9.6 %,
2
adjust partial load adjusting screw [1] to 9.3 %.
– Turning clockwise increases the CO
– Turning anti-clockwise reduces the CO
Fig. 38 Correct the CO
2
(boiler size 160 kW)
1
Partial load adjusting screw
2
Covering screw
B Recheck the CO
content and enter the value in the
2
commissioning report, Chapter 6.23.
Logano plus GB312 - Subject to technical modifications.
content.
2
content.
2
content under partial load

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents