Installation Location - gledhill BMA 180 HP-DEM Installation & Servicing Instructions Manual

Boilermate and ecodan air source heat pump
Table of Contents

Advertisement

ECODAN AIR SOURCE HEAT PUMP
1. Safety precautions
1.3. Before electric work
Caution:
• Be sure to install a circuit breaker. If it is not installed, there may be a risk
to get an electric shock.
• For the power lines, use standard cables of suffi cient capacity. Otherwise,
it may cause a short circuit, overheating, or fi re.
• When installing the power lines, do not apply tension to the cables. The
cables may be cut or overheated resulting in a fi re.
1.4. Before starting the test run
Caution:
• Turn on the main power switch more than 12 hours before starting opera-
tion. Starting operation immediately after turning on the power switch can
severely damage the internal parts. Keep the main power switch turned on
during the operating period.
• Before starting operation, check that all panels, guards and other protec-
tive parts are correctly installed. Make sure not to get injured by touching
rotating, hot, or high voltage parts.
1.5. Using R410A refrigerant air to water heat pump
Caution:
• Use only R410A refrigerant. If another refrigerant is used, the chlorine will
let the oil deteriorate.
• Use the following tools specifically designed for R410A refrigerant use.
Contact your nearest installer for further details.
Tools (for R410A)
Gauge manifold
Gas leak detector
Torque wrench

2. Installation location

Fig. 2-1
Charge hose
Vacuum pump adapter
Electronic refrigerant charging scale
(mm)
Page 39
• Make sure to ground the unit. Do not connect the ground wire to gas or
water pipes, lighting rods, or telephone grounding lines. If the unit is not
properly grounded, there may be a risk to get an electric shock.
• Make sure to use circuit breakers (ground fault interrupter, isolating switch
(+B fuse), and molded case circuit breaker) with the specifi ed capacity. If
the circuit breaker capacity is larger than the specified capacity, break-
down or fi re may result.
• Do not touch any switch with wet hands. There may be a risk to get an
electric shock.
• Do not touch the refrigerant pipes with bare hands while unit is running.
The refrigerant pipes can be hot or cold depending on the condition of the
fl owing refrigerant. There may be a risk to get burn or frostbite.
• After stopping operation, make sure to wait at least five minutes before
turning off the main power. Otherwise, it may cause water leakage or
breakdown.
• Be sure to use the proper tools. If dust, debris, or moisture enters the re-
frigerant pipes, the refrigeration oil may deteriorate.
• Do not use a charging cylinder. If a charging cylinder is used, the compo-
sition of the refrigerant may change and the effi ciency will be worsened.
2.1. Choosing the outdoor unit installation location
• Avoid locations where the unit is exposed to direct sunlight or other sources of
heat.
• Select a location where noise emitted by the unit does not disturb neighbors.
• Select a location where easy wiring and pipe access to the power source is
available.
• Avoid locations where combustible gases may leak, be produced, fl ow, or accu-
mulate.
• Note that condensate water may be produced by the unit during operation.
• Select a level location that can bear the weight and vibration of the unit.
• Avoid locations where the unit can be covered with snow. In areas where heavy
snow fall is anticipated, special precautions must be taken to prevent the snow
from blocking the air intake such as to install the unit at higher position or install-
ing a hood on the air intake. This can reduce the airfl ow and the unit may not
operate properly.
• Avoid locations where the unit is exposed to oil, steam, or sulfuric gas.
• Make sure to hold the handles to transport the unit. Do not hold the base of the
unit, as there is a risk that hands or fi ngers may be pinched.
2.2. Outline dimensions (Outdoor unit) (Fig. 2-1)
2.3. Pipework Installation
All external pipework shall be insulated to ensure minimal thermal heat loss and
also weather protection. Mineral wool insulation (internal diameter 22mm,
thermal conductivity 0.04W/m.K) shall be used along with Plysolene sheeting
(PIB) to wrap around for weather protection.
All field supplied pipework must be connected to the heat pump boiler by using
QTY2 600mm 1" bore steel braided rubber lined pipes, one for flow and one for
return, supplied with the unit.
Pipework between the unit and the hot water tank shall be 1". Provision shall be
taken to avoid this pipework freezing during winter months.
Under some operating conditions, condensate water may be produced which
will drain away from the unit. If this is likely to cause a problem (eg. due to
freezing on a pathway), we suggest incorporating a 150mm wide by 50mm
deep gravel filled channel as a soakaway, or a similar arrangement to suit the
location.
3

Advertisement

Table of Contents
loading

Table of Contents