gledhill BMA 180 HP-DEM Installation & Servicing Instructions Manual page 10

Boilermate and ecodan air source heat pump
Table of Contents

Advertisement

DESIGN
Primary System Pipework Connections for BoilerMate A-Class HP 180 Model Only
Please note:
This is a diagramatic representation,
all pipework should enter through
base of appliance.
All connections are 22mm.
Zone 1
flow
Either radiator or
underfloor heating circuit
Zone 1
return
Water out
(flow)
A
B
Water in
(return)
Ecodan
(rear)
Figure 1.5
Page 10

Advertisement

Table of Contents
loading

Table of Contents