Connecting The Gas Piping; To Connect The Gas Pipe; Connecting The Boiler To The Flue Gas System; To Change The Gas Boiler To 80/125 Concentric Connection - Daikin EHYKOMB33AA Installation And Operation Manual

Hybrid heat pump – gas boiler
Hide thumbs Also See for EHYKOMB33AA:
Table of Contents

Advertisement

7 Installation
7 Open the switch box cover of the indoor unit.
8 Plug the indoor unit connector into X39A of the indoor unit PCB.
9 Close the switch box cover of the indoor unit.
10 Close the switch box cover of the gas boiler.
11 Close the gas boiler.
7.6
Connecting the gas piping
7.6.1
To connect the gas pipe
1 Connect  a  gas  valve  to  the  15  mm  gas  connection  of  the  gas
boiler  and  connect  it  to  the  field  pipe  according  to  local
regulations.
2 Install a gas mesh filter in the gas connection if the gas may be
contaminated.
3 Connect the gas boiler to the gas supply.
Installation and operation manual
16
4 Check  all  parts  for  gas  leaks  on  a  pressure  of  maximum
50  mbar  (500  mm  H
O).  There  may  be  no  stress  on  the  gas
2
supply connection.
7.7
Connecting the boiler to the flue
gas system
The gas boiler is designed ONLY for operation independent of room
air.
The  gas  boiler  is  delivered  with  a  60/100  concentric  flue  gas/air
intake connection. An adapter piece 80/125 concentric connection is
also available.
The concentric adapter piece is equipped with a measuring point for
the gas exhaust and one for the air intake.
b
a
a
Gas exhaust measuring point
b
Air intake measuring point
The concentric adapter piece is equipped with a measuring point for
the gas exhaust and one for the air intake.
The air supply and the flue pipe can also be connected separately as
a  dual  pipe  connection.  An  option  to  change  the  gas  boiler  from  a
concentric to a dual pipe connection is available.
NOTICE
When installing the gas exhaust take the installation of the
outdoor  unit  into  account.  Make  sure  the  exhaust  gases
are not sucked into the evaporator.
When  installing  the  gas  exhaust  and  the  air  intake,  take
into account the serviceability of the indoor unit. When the
gas  exhaust/air  intake  goes  backwards  over  the  indoor
unit,  the  expansion  vessel  cannot  be  accessed  and,  if
necessary, will have to be replaced outside the unit.
7.7.1
To change the gas boiler to 80/125
concentric connection
The  concentric  connection  can  be  changed  from  Ø60/100  to
Ø80/125 by an adapter set.
1 Remove the concentric pipe from the air supply and combustion
gas  pipe  at  the  top  of  the  gas  boiler  by  turning
counterclockwise.
2 Remove the O­ring from the concentric pipe and fit it around the
flange of the concentric adapter Ø80/125.
3 Place  the  concentric  adapter  in  the  top  of  the  appliance  and
turn it clockwise so that the measurement nipple points straight
forward.
4 Fit  the  concentric  pipe  for  the  air  supply  and  combustion  gas
flue  into  the  adapter.  The  integral  sealing  ring  ensures  an
airtight connection.
5 Check  the  connection  of  the  internal  flue  pipe  and  the
condensate collector. Make sure it is properly connected.
Daikin Altherma hybrid heat pump – gas boiler module
EHYKOMB33AA
4P353067­1A – 2013.10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Altherma ehykomb33aa

Table of Contents