Wiring; Drainage Pipe Insulation - koppel KV24ODU-ARF21 Service Manual

Four-way ceiling cassette/ceiling-floor mount: convertible/universal outdoor unit
Table of Contents

Advertisement

Wiring

For construction convenience, before laying pipes, use insulation material to insulate the pipes to be deal with, at the same time, at two ends
of the pipe, remain some length not to be insulated, in order to be welded and check the leakage after laying the pipes.
3). Insulate for the jointing area, expanding area and the flange area
① Insulate for the jointing area, expanding area and the flange area should be done after checking leakage of the pipes
② Make sure there's no clearance in the joining part of the accessorial insulation material and local preparative insulation material.

5.3 Drainage pipe insulation

1)
The connection part should be insulated, or else water will be condensing at the non-insulation part.
5.4 Note
1)
The jointing area, expanding area and the flange area should be heat insulated after passing the pressure test
2)
The gas and liquid pipe should be heat insulated individually, the connecting part should be heat insulated individually.
3)
Use the attached heat-insulation material to insulate the pipe connections (pipes' tie-in ,expand nut ) of the indoor unit.
6. Wiring
Please refer to the Wiring Diagram.