3-Hole Bucket < Tb180Fr; Changing The Link Arm Installation Position - Takeuchi TB153FR Operator's Manual

Hydraulic excavator
Table of Contents

Advertisement

OPTIONS
3-Hole Bucket < TB180FR >
A
B
The digging capacity increases when the
bucket's link arm installation position is
switched from (A) to (B). However, this
shortens the bucket stroke.
• Struck capacity (SAE) :
0.210 m
• Rated capacity (SAE) :
0.261 m
Changing the Link Arm
Installation Position
Refer to page 148 "Replacing the Bucket" in
the manual.
OL1L170
OL1L180
3
(0.275 cu. yd.)
3
(0.341 cu. yd.)
199

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Tb180frTb153 fr

Table of Contents