8. Installation details
8.1
Wrench torque sheet for installation
Outside diameter
mm
φ6.35
φ9.52
φ12.7
φ15.88
φ19.05
8.2
Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Unit
7K
mm2
1.0
8.3
Pipe length and the elevation
Capacity
Btu/h
GAS
3/8'' (φ9.52)
7k~12K
1/2'' (φ12.7)
1/2'' (φ12.7)
16K~28K
5/8'' (φ15.88)
5/8'' (φ15.88)
5/8'' (φ15.88)
30K~36K
3/4'' (φ19.05)
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be install per 5-7 meters.
- 19 -
Torque
inch
Kg.m
1/4
1.8
3/8
4.2
1/2
5.5
5/8
6.6
3/4
6.6
Grade
9K
12K
1.0
1.5
Standard
Pipe size
LIQUID
1/4'' (φ6.35)
1/4'' (φ6.35)
1/4'' (φ6.35)
1/4'' (φ6.35)
3/8'' (φ9.52)
3/8'' (φ9.52)
3/8'' (φ9.52)
Service manual
18K
24K
28K
2.5
2.5
2.5
Max.
length
(m)
Elevation
B (m)
5
5
5
5
5
8
5
10
5
10
5
15
5
15
In case that
more than
5
Max.
Additional
Elevation
refrigerant
A (m)
(g/m)
10
30
10
30
15
30
20
30
20
65
30
65
30
65
Need help?