8. Installation details
8.1
Wrench torque sheet for installation
Outside diameter
mm
φ6.35
φ9.53
φ12.7
8.2
Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Unit
9K
mm2
1.0
8.3
Pipe length and the elevation
Capacity
Btu/h
GAS
9K
3/8'' (φ9.52)
12K
1/2'' (φ12.7)
18K
1/2'' (φ12.7)
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be install per 5-7 meters.
- 18 -
Torque
inch
Kg.m
1/4
1.8
3/8
4.2
1/2
5.5
12K
18K
1.5
2.5
Pipe size
LIQUID
1/4'' (φ6.35)
1/4'' (φ6.35)
1/4'' (φ6.35)
Service manual
Standard
Max.
length
(m)
Elevation
B (m)
5
5
5
5
5
8
In case that
more than
5
Max.
Additional
Elevation
refrigerant
A (m)
(g/m)
10
30
10
30
15
30