8.1 Wrench torque sheet for installation
8.2 Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
8.3 Pipe length and the elevation
Capacity
Btu/h
GAS
07k~09K
3/8'' (φ9.52)
12K
1/2'' (φ12.7)
Capacity is base on standard length and maximum allowance length is base of reliability.
16
All manuals and user guides at all-guides.com
Service manual
8. Installation details
Outside diameter
mm
inch
φ6.35
1/4
φ9.52
3/8
φ12.7
1/2
Unit
7K
2
mm
1.0
Standard
Pipe size
LIQUID
1/4'' (φ6.35)
1/4'' (φ6.35)
Caution:
Oil trap should be install per 5-7 meters.
Torque
Kg.m
1.8
4.2
5.5
Grade
9K
12K
1.0
1.5
Max.
length
Elevation
(m)
B (m)
5
5
5
5
Max. Pipe
Additional
length
refrigerant
A (m)
(g/m)
10
30
10
30
In case that
more than 5m.