Maintenance; Weekly Maintenance - Proheat M50 G-II PCM Service Manual

M series
Hide thumbs Also See for M50 G-II PCM:
Table of Contents

Advertisement

NOTICE
The flame hours can be determined
from the G-II PCM data download.
PK0064 is required to download the
G-II PCM data. See the parts book
at www.proheat.com
NOTICE
A higher duty cycle may require a more
frequent maintenance schedule. i.e.
2 or 3 times per year.
PROHEAT M-SERIES G-II PCM SERVICE MANUAL
5.0

MAINTENANCE

Your PROHEAT has been designed to operate with a minimum of maintenance.
To ensure the efficient operation of your heater an ANNUAL MAINTENANCE
TUNE-UP is recommended to be performed each year or every 1000 flame
hours. In addition, weekly operation is recommended.
Proper maintenance will result in the following benefits:
• Maximum heat transfer to the coolant
• Minimum battery power draw
• Long term cost savings
• Increased reliability
Check the system annually before each heating season. There are several
maintenance procedures you can perform to keep your heater in service.
Read this section of the manual carefully.
Figure 5-1.
5.1

WEEKLY MAINTENANCE

Run the heater a minimum of once a week to keep new fuel in the heater's
critical components.
5-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M80 g-ii pcmM90 g-ii pcmM105 g-ii pcmM125 g-ii pcm

Table of Contents