Observation Port Installation; Burner Installation - Viessmann Vitocrossal 300 CT3 Series Installation Instructions Manual

Gas-fired condensing boiler 638 to 3361 mbh 187 to 985 kw
Hide thumbs Also See for Vitocrossal 300 CT3 Series:
Table of Contents

Advertisement

Assembly

Observation Port Installation

Legend
A Plastic hose
B Brass nipple
C Gaskets

Burner Installation

IMPORTANT
The combustion head of the burner must protrude through
the insulation of the combustion chamber door, and the
minimum of 5½ in. (140 mm) of the combustion head
length must be maintained (total length from flange).
In case a shorter combustion head is used, all combustion
results during all firing stages must be properly verified.
CAUTION
The temperature resistance of the combustion head
must be a minimum of 932° F (500° C).
IMPORTANT
Due to the location of the observation port in the
combustion chamber door, it might be necessary to rotate
the burner 180°. The burner itself can be installed in this
position. It does not adversely affect the burner operation.
The gas piping will then be on top of the burner rather
than on the bottom (Weishaupt WG20 only).
26
Vitocrossal 300, CT3 Series Installation
The combustion chamber is equipped with an observation
port for the burner flame and combustionchamber. The
standard equipment includes a plastic hose A, a brass
nipple B, and gaskets C. The brass nipple is to be
installed in the tube part of the observation port. One end
of the plastic hose attaches to the nipple.
The other end must be extended inside the burner housing
where it is attached to the blower housing.
A minute amount of air then purges the observation port
glass during burner operation and will keep the glass from
fogging up.
For burner installation see instructions supplied
by burner manufacturer
The proper burner plate for desired burner is supplied
by Viessmann
H Install the burner plate (part of the standard delivery).
H Once the burner has been mounted with the combustion
head, the door must be opened and any gap between
the combustion chamber door insulation and the
combustion head must be properly filled with supplied
Fiberfrax insulation material.
See Burner Blast Tube Insulation Installation
Instructions on following page

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents