MTD 190-032 Operator's Manual page 9

Two-stage snow thrower attachment
Table of Contents

Advertisement

Attaching The Chute Directional Control
1.
Attach the chute directional control assembly to the upper
lift link on the left side of the auger housing. Assemble with
two hex screws and two saddle washers as illustrated in
Fig. 3-11. Secure with two flange nuts.
Upper Lift Link
Figure 3-11
2.
Secure the upper chute crank rod (A) to the joint block on
the lower chute crank rod with the cotter pin (B) provided.
A
B
Figure 3-12
See Fig. 3-12.
3.
Fasten chute tilt cables to chute directional control with
two of the cable ties provided. Pull cable ties until snug and
trim excess.
Chute Directional
Control Assembly
Attaching The Lift Handle
1.
Attach lift handle to lift bracket on the right side of auger
housing assembly with two hex screws and two flange nuts
provided. See Fig. 3-13.
Figure 3-13
2.
Fasten the lift cable to the lift handle with two of the cable
ties provided. Pull the cable ties until snug and trim excess.
Mounting The Auger Assembly
IMPORTANT: It will be necessary to have a second person assist
you to complete the following steps.
1.
Install a shoulder bolt on each side of the tractor and
secure with a lock nut. See Fig. 3-14.
Figure 3-14
s
ectiOn
Lift Handle
Lift Bracket
Shoulder Bolt
3 — a
& s
-u
sseMbly
et
p
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents