INSTALLING
Continued
14

BUILT-IN FIREPLACE INSTALLATION

Built-in installation of this fireplace involves installing fireplace into a framed-in
enclosure. This makes the front of fireplace flush with wall. If installing a mantel
above the fireplace, but you must follow the clearances shown in Figure 15, page 15.
Follow the instructions below to install the fireplace in this manner.
Height
Actual Framing Actual
3
32
/
" 33"
8
1. Frame in rough opening. Use dimensions shown in Figure 12 for the rough
opening.
Figure 12 - Rough Opening for Installing in Wall
If installing in a corner, use dimensions shown in Figure 13 for the rough opening.
The height is 33" which is the same as the wall opening above.
Figure 13 - Rough Opening for Installing in Corner
2. Install a properly grounded, three-prong 120 volt electrical outlet at fireplace
location. Locate outlet inside the framed enclosure.
3. Install gas piping to fireplace location. This installation includes an approved
flexible gas line (if allowed by local codes) after the manual shutoff valve. The
flexible gas line must be the last item installed on the gas piping. See Installing
Gas Piping to Fireplace Location, page 16.
4. Carefully set fireplace in front of rough opening with back of fireplace inside
wall opening.
5. Attach flexible gas line to fireplace gas regulator. See Connecting Fireplace to
Gas Supply, page 17.
6. Route blower electrical cord through side or rear access door of fireplace. Plug
electrical cord into electrical outlet.
7. Carefully insert fireplace into rough opening.
Front Width
Framing Actual
5
1
34
/
" 35
/
"
16
2
17 3/4"
33"
35 1/2"
39 3/8"
35 1/2"
55 5/8"
Depth
Framing
3
11
16
/
" 17
/
"
16
4
27 7/8"
103281

Advertisement

Table of Contents
loading

Table of Contents