Off Peak supply connection
A suitable electrical connection must be taken
from the Off Peak supply to the Electromax
terminal block. The supply cable should
be 1.5mm
cross sectional area 3 core
2
HOFR sheathed cable and must be routed
into the Electromax via one of the 20mm
cable glands previously fitted (see section
3.3, page 10). The Live (Brown) conductor
should be connected to the termination
marked "OFF PEAK SUPPLY L"; the Neutral
(Blue) conductor should be connected to the
termination marked "OFF PEAK NEUTRAL
N"; the Earth (Green/Yellow) conductor
should be connected to one of the terminations
marked "EARTH CONNECTIONS
section 6.1, page 19 for MCB and isolation
requirements.
Pump Fuse (3 Amp)
Diagram 13 Electrical Supply Connection Block
20
Installation & Servicing Instructions
24 Hour supply connection (NB NOT Boiler
connection)
A suitable electrical connection must be taken
from the 24 Hour supply to the Electromax
terminal block. The supply cable should
be 1.5mm
HOFR sheathed cable and must be routed
into the Electromax via one of the 20mm
cable glands previously fitted (see section
3.3, page 10). The Live (Brown) conductor
should be connected to the termination
marked "24 HOUR SUPPLY L"; the Neutral
(Blue) conductor should be connected to the
termination marked " 24 HOUR NEUTRAL
N"; the Earth (Green/Yellow) conductor should
". See
be connected to one of the terminations
marked "EARTH CONNECTIONS
section 6.1, page 19 for MCB and isolation
requirements.
Thermostat 'L' Fuse (3 Amp)
cross sectional area 3 core
2
". See