Preparing the Cabinet
Sealing the Cabinet
For sanitation purposes, it may be necessary to
seal the base of the cabinet to the floor. This can
be accomplished by laying a bead of silicone seal-
ant between the base of the cabinet and the floor
as shown by the figure below.
When sealing the cabinet to the floor, make sure
that the louvered front grille plate can still be
removed for condenser maintenance and cleaning.
CABINET
BEAD SILICON
SEALER (RTV)
FLOOR
Form No. Z2288
Rev. 05.21.10
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
Finished flooring should be protected with
appropriate material to avoid damage from
moving the unit.
If unit has been laid on its back or sides, place
unit upright and allow minimum of 24 hours
before connecting power.
Plug the unit into the 15 amp grounded outlet
located in the installation opening. With power
applied to the unit, check that lighting and cooling
function operate properly, then turn off power to
wall outlet at the circuit breaker.
To prevent damage to the counter top and unit
underneath, do not place heavy objects on the
counter top directly above the unit.
Check interior door openings inside unit and ensure
unit is level.
4
CAUTION:
CAUTION:
Need help?
Do you have a question about the HC24RS and is the answer not in the manual?
Questions and answers