Installing Firebox Into Outer Can; Securing Appliance To Stove Pipe/Liner; Leveling Legs - Quadra-Fire 31-I ACC Installation Manual

3100-i acc wood insert automatic combustion control (acc)
Hide thumbs Also See for 31-I ACC:
Table of Contents

Advertisement

G. Installing Firebox into Outer Can
For easier installation, remove the baffle protection chan-
nel, tube channel assembly, baffle board and ceramic blan-
ket from the appliance before installing into the outer can.
See Owner's Manual for instructions.
1. Slide the appliance into the outer can. Secure with
Phillips head bolts previously removed from under the
ashlip. Figure 21.1.
2. Re-install the timer assembly. The timer arm must be
between the first and second control arm tabs. Figure
21.2.
3. Attach the timer arm to the timer door.
4. Test the controls to ensure the timer operates correctly.
Phillips Head Bolts
Figure 21.1
Timer Door
Figure 21.2
April 9, 2014
Timer Arm
Control Arm Tabs
7044-225B
H. Securing Appliance to Stove Pipe/Liner
1. Once you have the appliance in place and secured, reach
up through the flue opening and grab the attachment bar
and pull down inside flue opening. Figure 21.3.
2. Insert the 5/16 bolts inside the cast flue and through the
chimney mounting bar. Securely tighten the nuts. Fas-
teners are provided.
3. Re-install the tube channel assembly, baffle board,
ceramic blanket and baffle protection channel.
Attachment Bar
Figure 21.3
I. Leveling Legs
1. Remove the 2 screws already installed on each leg.
2. Move legs to the desired height.
3. Re-install the screws to secure in place.
Remove 2 screws from both sides.
Adjust the legs up or down to level
appliance.
Figure 21.4
31-I ACC
Chimney Mounting Bar
21

Advertisement

Table of Contents
loading

Table of Contents