Navico 2kW Installation Manual page 21

Navico radar 2kw and 4kw installation manual
Table of Contents

Advertisement

Remove the shield cover from the underside of the main unit to expose the connector
locations and ground terminal location.
The broken line shows the route for the interconnection cable.
Identify the connector ends B, C, and D on the 2 kW interconnection cable. Connector D is
a grounding strap.
Place the locking nut, gasket A and gasket B over the end of the interconnection cable in
the order shown, then push the interconnection cable through the cable entry point into
the radome. (Ensure that you push through sufficient cable to easily join the connectors.)
At the cable entry point, take care that the grooves in gaskets A and B are opposite each
other (see the figure). Tighten the locking nuts to hold the interconnection cable firmly in
place and to provide a waterproof seal.
Wiring the radar system | 19

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Navico 2kW

This manual is also suitable for:

4kw

Table of Contents