Checkup And Adjustment Of Mechanism Phase - JVC GR-DVL220U Service Manual

Jvc digital video camera service manual
Hide thumbs Also See for GR-DVL220U:
Table of Contents

Advertisement

2.5 CHECKUP AND ADJUSTMENT OF MECHANISM PHASE

<Rotary encoder>
Set the "I" of the rotary
part at the tapped hole
as shown in the figure.
<Worm wheel> (Note 2)
Set the worm wheel so
that its locating hole
meets the hole on the
main deck assembly.
<Main cam gear
/Brake control plate>
After fitting the main cam
gear and brake control plate
together,set them together
so that their locating holes
meet the hole on the main
deck assembly.
Note 1:
Since the connect gear 2 is tightly fixed to the main deck
by caulking, adjust its phase with the connect gear and
sub cam gear.
<Connect gear> (Note 2)
Set the connect gear so
that its locating hole meets
the hole on the main deck
assembly.
Note 1
<Connect gear 2> (Note 2)
Set the connect gear 2 so
that its locating hole meets
the hole on the main deck
assembly.
Note 2:
The part that needs phase adjustment by the hole on the main
deck assembly must exactly be set as the specified phase.
There is a fear that some part is installed in a wrong phase
because assembling of the mechanism is automated. If so,
set every part in the correct phase whenever the mechanism
is reassembled.
Fig. 2-5-1
<Sub cam gear>
Set the sub cam gear
so that its locating hole
meets the hole on the
main deck assembly.
This state represents
that the mechanism is
in the EJECT mode,
which is the "mechanism
assembly mode".
2-15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents