Checkup And Adjustment Of Mechanism Phase - JVC GR-AXM236U Service Manual

Compact vhs camcorder
Table of Contents

Advertisement

2.3 CHECKUP AND ADJUSTMENT OF MECHANISM PHASE

Note: Pay careful attention to the installing order and phase of
mechanism parts of the loading system.
Align the hole of the Loading gear
(T) assembly to that of the deck.
Align one of the three holes of
wheel gear to the deck hole.
Align this part to each
"Triangle" mark.
2-6
Fig. 2-3-1 Top of main deck
Align this part to each
"Triangle" mark.
Fig. 2-3-2 Rotary encoder
Align the two holes of the Loading
ring assembly to those of the deck.
Align the hole of the
link lever assembly to
the deck hole.
Align each one link lever
assembly hole and deck
hole to the hole at the
control cam position.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents