Finishing Commissioning - Worcester 440CDi Instruction Manual

Floor standing rsf gas-fired condensing combination boiler
Table of Contents

Advertisement

C
F
36

FINISHING COMMISSIONING

A
FINISHING COMMISSIONING
1
Engage top panel (A) onto rear retainers
(B) and lower front of panel into position.
Secure with screws (C).
B
2
Swing control panel assembly (D) into
the boiler.
Secure with screw (E).
3
Locate bottom corners of the front panel
(F) into retainers (G).
Push top of door to engage clips.
D
E
G
HANDOVER:
Complete the Benchmark log book at the
rear of the manual.
Set up the controls and show the user how
to operate all the controls shown in the
User Guide.
Instruct the customer how to repressurise
the system.
If the appliance is unused and exposed to
freezing conditions, advise the customer
of the precautions necessary to prevent
damage to the boiler, system and building.
In the event of the appliance being
inoperative, isolate the boiler and drain
the system and boiler.
INSTALLATION & SERVICING INSTRUCTIONS
8 716 115 219b (09.2008)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents