IBM 11000VA Manual page 4

Lcd 5u rack uninterruptible power supply
Table of Contents

Advertisement

Supports IPv6 for future-proofing IP addressing and security.
Includes a graphical LCD display that lets you configure the device and displays important UPS status
information in one of nine languages:
English
French
German
Spanish
Russian
Korean
Japanese
Simplified Chinese
Traditional Chinese
Includes a real-time clock that enables precise shutdown and powerup of systems in preferred
sequence, and time stamping on event logs to track and record specific power-related occurrences.
Integrates with IBM Systems Director Active Energy Manager for power and thermal trending analysis
and management.
Has load segments that allow for individual control of receptacle groups, maximizing run time for
critical devices.
Supports an optional network management card (part number 46M4140) for enhanced UPS
monitoring and control.
Allows dual channel communication through the USB port and an optional Network Management
Card at the same time, which is an effective redundancy feature that maximizes communications
flexibility.
Supports an optional Extended Battery Module (EBM) for increased runtime requirements.
Includes a Remote Emergency Power Off (REPO) port to remotely power off the UPS unit to prevent
battery operation during a power failure.
Requires the following input power:
200 - 240 V ac, 50/60 Hz
Single-phase circuit with a 2-pole circuit breaker
63A (Europe) or 80A (North America) circuit
Includes hot swap batteries for maximum uptime, availability, and ease of maintenance.
Supports an optional Environmental Monitoring Probe (part number 46M4113) for thermal
management requirements (temperature and humidity), which requires that the Network Management
Card be installed.
Offers an Advanced Battery Management (ABM) three-stage charging technology, which significantly
extends battery service life and optimizes recharge time. The three stages are:
1.
The battery is quickly charged to 90% to make sure the UPS is prepared for the next outage.
2.
ABM finishes charging the battery with a more moderate float charge.
3.
After the battery is charged, ABM turns the charger off, thereby preventing the batteries from
being overcharged.
IBM 11000VA LCD 5U Rack Uninterruptible Power Supply
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents