Pre-‐Operating
I nstructions:
G enerator
S etup
CHECK
A IR
C LEANER
E LEMENT:
Refer
t o
" Air
C leaner
M aintenance"
i n
t he
M aintenance
s ection
o f
t his
O wner's
M anual
to
e nsure
A ir
C leaner
E lement
i s
i n
o perable
c ondition.
GROUNDING
T HE
G ENERATOR:
1. Connect
t he
G round
T erminal
o n
t he
g enerator
t o
a n
a cceptable
s ource
o f
electrical
g round,
s uch
a s
a
c opper-‐grounding
s take,
u sing
c opper
e lectrical
w ire
with
a
m inimum
d iameter
o f
1 6
g auge.
(continued)
R efer
t o
C ontrols
a nd
F eatures
s ection.
19
LIFAN
P ower
U SA
2205
I ndustrial
P ark
R oad
Van
B uren,
A R
7 2956
866-‐471-‐7464
www.lifanpowerusa.com