Chapter Ii Installation; Unpacking And Inspection; Selecting Location; Loose-Shipped Parts - ICI TOPPER Installation And Service Manual

Table of Contents

Advertisement

This chapter covers unpacking and inspection, selecting location, installing TOPPER and
related components, connecting water inlet and electrical requirements.

UNPACKING AND INSPECTION

Upon receiving unit, immediately remove unit from shipping carton and inspect for
shipping damage.
NOTE: Before leaving the factory all TOPPER units were carefully inspected and the
carrier has accepted and signed for them. Any damage or irregularities should be noted
at the time of delivery and immediately reported to delivering carrier. Request a written
inspection report from claims inspector to substantiate any necessary claim. File claim
with delivering agency, not International Carbonic Inc.!
Unpack LOOSE-SHIPPED PARTS. At this time make sure all parts listed are present
and in good condition. If any parts are missing, notify factory.
Item
Part
No.
No.
1
2*
S-101
3*
S-221
4
S-1156
5
S-105
6
-----
7*
S-208
8*
9*
S-208A
* Optional

SELECTING LOCATION

IMPORTANT: Ambient temperature for TOPPER should not exceed 100 degrees "F".
Operation of cooling unit in ambient above 100 degrees "F" can and will contribute to
early failure of condensing unit and poor quality of finished product.
CHAPTER II
INSTALLATION
TABLE 2-1
LOOSE - SHIPPED PARTS
Name
Installation/Service Manual
High-pressure C02 Regulator
Low-pressure C02 Regulator
Drain pan TOPPER
6' Gas Line (Inner Braid)
Product Decals
Water Pressure Regulator
Water filter
Water Pressure Regulator
2-1
Qty
1
1
1
1
1
1 per flavor
1
1
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Topper-j

Table of Contents