Communication (Comm) - Toshiba Satellite M45 Maintenance Manual

Personal computer
Hide thumbs Also See for Satellite M45:
Table of Contents

Advertisement

3 Diagnostic Programs
3.9

Communication (COMM)

Subtest 01
LPT
This test item is to check whether there is open or short circuit issue in the external
pins by looping back the external pins, controlling the voltage of each data pin,
control pin and status pin.
The test requires an external connector to insert into the tested LPT port. Below is the
connector's description.
Fixture Description:
(9) + PD7
(8) + PD6
(7) + PD5
(6) + PD4
(5) + PD3
(4) + PD2
(3) + PD1
(2) +PD0
Note: (1)~(17) -------- Pin number
PD0~ PD7--------Data Line
Status Line -------- –ERROR(S3), +SELECT(S4), –ACK(S6), +PE(S5), +BUSY(S7)
Control Line-------- –AUTFD(C1), –PINIT(C2), -STROBE(C0), –SLIN(C3)
1. Register Check
Check whether the data register and control register works normally.
2. IRQ Check
Check whether LPT interrupt works normally.
3. External Loop back
Check whether there is open or short circuit issue.
4. ECP Mode
54
Satellite M40/M45 TECRA A4 Dynabook Vx/4 Maintenance Manual
3.9 Communication
(15) -ERROR
(14) -AUTFD
(13)
(16) -PINIT
(1) - STROBE
(10) - ACK
(12) + PE
(17) - SLIN
(11)+ BUSY

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tecra a4Dynabook vx/4Satellite m40

Table of Contents