RBI Dominator Series Installation & Operating Instructions Manual page 8

Finned copper tube gas boilers & water heater
Table of Contents

Advertisement

Vertical Combustion Air and Venting, Metal Chimney System Shown
Figure 6
Locate exhaust terminal downwind from air intake to reduce potential for fl ue gas recirculation.
Combination Air Intake and Venting, Masonary Chimney Shown
Figure 7
10 FT 3.1 m
8
F F
Finned copper tube gas boilers & water heaters – Boiler Manual
Fi
d
b
b il
4 FT
1.2 m
1.5 FT
0.5 m
5 FT
1.5 m
3 FT 1 m
1.5 FT .5m
&
h
B il
M
10 FT 3.1 m
5 1/2 FT
1.7 m
l

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents