8. Install the inner metal flue into the outlet, up to
the wallplate flange mark.
9. Lift boiler with flue in place, engage inner and
outer flue, slide into position
3.05 Domina top outlet flue conversion
Remove fan by pulling off electrical connections. Pull
off air pressure switch tubes from the air pressure
switch remove 2 screws b. Rotate the fan upward to
disengage it from the securing pin a.
1
b
b
Take off the four screws which fix the top sealed
the cover and gasket through 90° and fit it to the
Secure them both in place with the four screws
16
DOMINA N 80
Fig. 16h
Rear
Fig. 17a
Fig. 17c
9. Make sure the inner flue is fully engaged in
the flue terminal, secure boiler with two nuts
and washers, sevure bottom of boiler using two
screws and washers.
Remove the securing screw that locates the fan
nozzle extension to the fan and remove the nozzle
2
extension and jointing mastic (this is not required
for top outlet flueing).
2
chamber cover, remove the cover and gasket. Rotate
rear of the boiler to cover the original flue outlet.
removed previously.
Fig. 17d
Fig. 16i
1
Rear
a
Fig. 17b
Fig. 17e