Starting The Aria Soho; Before Starting The Aria Soho System - LG-Nortel ARIA SOHO Installation Manual

Hardware description and installation manual
Table of Contents

Advertisement

ARIA SOHO Hardware Description and Installation Manual

STARTING THE ARIA SOHO

6.1 Before Starting the ARIA SOHO System

In preparation for programming, perform the following Steps:
1. The DIP switch (SW2) should be turned ON prior to installing the MBU to protect the System data in
case of power failure.
2. Check the DIP switch (SW1) of the MBU to All ON.
3. Plug the AC power cord into the ARIA SOHO System and AC outlet.
4. Program the Nation Code (PGM100) as applicable.
5. Reset the ARIA SOHO System.
6. Set the 4
programmed features after System power-up and initialization.
6
th
pole (SW1) of the MBU OFF when the System operates normally, to protect
S
S
T
A
R
T
I
N
G
T
A
R
T
I
N
G
44
A
R
I
A
A
R
I
A
T
H
E
T
H
E
Issue 1
Mar, 2007
S
O
H
O
S
O
H
O

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents