Step 2
Refer to Figure 23. Remove existing 7/8 by 2-1/4 in (57 mm) hardware from both eleva-
tion pivot/joint assemblies at indicated positions and install grounding cables as shown.
Use supplied 7/8 by 2-3/4 in (70 mm) bolts and nuts
Note: Supplied 3/4 in hardware is installed after reflector to ground mount installation.
Step 3
Securely tighten all remaining ground mount/jack assembly hardware per hardware ten-
sioning procedure.
The tripod ground mount assembly is now completed with the necessary operational
essentials. All ground mount options have separate instructional bulletins located in the
parts kit that contain the option.
The next step in the installation process is the reflector assembly. Proceed to the next
page to begin installation of the reflector.