Mitsubishi Electric MUZ-FD25VABH - E1 Service Manual page 54

Outdoor unit
Table of Contents

Advertisement

Mitsubishi ilmalämpöpumput huoltaa ja korjaa: Jäähdytinpalvelu RefGroup Oy
OPERATING PROCEDURE
2. Removing the inverter assembly, inverter P.C. board
(1) Remove the cabinet and panels. (Refer to 1.)
(2) Disconnect the lead wire to the reactor and the following con-
nectors;
<Inverter P.C. board>
CN721 (R.V. coil)
CN722 (Defrost heater)
CN932 (Fan motor)
CN641 (Defrost thermistor and discharge temperature ther-
mistor)
CN643 (Ambient temperature thermistor)
CN644 (Outdoor heat exchanger temperature thermistor)
CN724 (LEV)
(3) Remove the compressor connector (CN61).
(4) Remove the screws fixing the relay panel. (Photo 3)
(5) Remove the inverter assembly. (Photo 4)
(6) Remove the screw of the earth wire and screw of the
T.B.support. (Photo 4)
(7) Remove the relay panel from the inverter assembly.
(8) Remove the inverter P.C. board from the relay panel.
3. Removing R.V. coil
(1) Remove the cabinet and panels. (Refer to 1.)
(2) Remove the R.V. coil. (Photo 5)
4. Removing the discharge temperature thermistor,
defrost thermistor and outdoor heat exchanger tem-
perature thermistor.
(1) Remove the cabinet and panels. (Refer to 1.)
(2) Pull out the discharge temperature thermistor from its holder.
(Photo 5)
(3) Pull out the defrost thermistor from its holder. (Photo 6)
(4) Pull out the outdoor heat exchanger temperature thermistor
from its holder. (Photo 6)
Photo 3
Photo 4 (Inverter assembly)
Heat sink
Relay panel
Photo 5
54
www.ilmalämpöpumput.com
PHOTOS
Screws of the
relay panel
Inverter
Screw of the
P.C. board
T.B.support
Screw of the
earth wire
R.V. coil
Discharge temperature thermistor
T.B.support

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents