Sharp CD-BA3100 Service Manual page 19

Hide thumbs Also See for CD-BA3100:
Table of Contents

Advertisement

28
MT IDLER GEAR F
42
LIFT GEAR A
45
53
46
10
47
11
Scale: 2 magnifications
(A)
(B)
37
38
43
34
LIFT GEAR B
41
36
MODE BIG GEAR
MODE BIG GEAR
LIFT GEAR A/B/C
ASSEMBLING POSITION
<Assembling method of lift gear>
After setting up the mode big gear in the
shown position, engage it with the STB gear A
(gear on the lower side) at the position (A),
and assemble them, turning it in the arrow direction
into the position (B). (The short tooth directs toward the
center of the mode big gear.)
42
LIFT GEAR A
41
MODE BIG GEAR
LIFT GEAR B
Figure 19
– 19 –
Mark position
(Assemble the mode big gear in this position.)
32
33
Direct the short tooth
toward the center.
Scale: 2 magnifications
43
44
LIFT GEAR C
CD-BA3100
04
CHANGE BOX R
Note:
To assemble the mode
big gear, incline it,
bring it into contact with
the circumference and
put the center hole into
position since the
hatched part of the main
base is overlapped with
the circumference.
44
LIFT GEAR C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents