Stanley Ashling Installation And Operation Instructions Manual page 11

Oil stoves
Table of Contents

Advertisement

3. Set-up the coals & coal matrix (see Coal Bed
Assembly Section) and light the stove (see
Stove Operation Section).
4. When the stove reaches its normal operating
temperature (i.e. at maximum setting), adjust the
draught regulator until the desired flame pattern
is achieved.
5. Using the flue sampling point (See Fig.16), check
that the Bacharach smoke number is not greater
than 2. (Hob is removed to access the flue sam-
pling point on the Ashling & Tara, but the hob
blanking plate is removed to access the Oisin flue
sampling point).
Fig.16
10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

TaraOisin

Table of Contents