Gas Boiler System Commissioning Checklist - Potterton Gold HE A Range Installation & Service Instructions Manual

Gold he a range condensing combination boiler
Hide thumbs Also See for Gold HE A Range:
Table of Contents

Advertisement

This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission according to the manufacturer's instructions and complete this Benchmark Commissioning Checklist will invalidate the warranty. This
does not affect the customer's statutory rights
Customer Name
Address
Boiler Make and Model
Boiler Serial Number
Commissioned by (print name)
Company Name
Company Address
To be completed by the customer on receipt of a Buildings Regulations Compliance Certificate*:
Building Regulations Notification Number (if applicable)
CONTROLS
Tick the appropriate boxes
Time and Temperature Control to Heating
Time and Temperature Control to Hot Water
Heating Zone Valves
Hot Water Zone Valves
Thermostatic Radiator Valves
Automatic Bypass to System
Boiler Interlock
ALL SYSTEMS
The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer's instructions
What system cleaner was used?
What inhibitor was used?
CENTRAL HEATING MODE
Gas Rate
Burner Operating Pressure (if applicable)
Central Heating Flow Temperature
Central Heating Return Temperature
COMBINATION BOILERS ONLY
Is the installation in a hard water area? (above 200ppm)
If yes and if required by the manufacturer, has a water scale reducer been fitted?
What type of scale reducer has been fitted?
DOMESTIC HOT WATER MODE
Gas Rate
Burner Operating Pressure (at maximum rate)
Cold Water Inlet Temperature
Hot Water has been checked at all outlets
Water Flow Rate
CONDENSING BOILERS ONLY
The condensate drain has been installed in accordance with the manufacturer's instructions and/or BS5545/BS6798
If the condensate pipe terminates externally, has the pipe diameter been increased and weatherproof insulation fitted?
ALL INSTALLATIONS
If required by the manufacturer, record the following
The heating and hot water system complies with the appropriate Building Regulations
The boiler and associated products have been installed and commissioned in accordance with manufacturer's instructions
The operation of the boiler and system controls have been demonstrated to and understood by the customer
The manufacturer's literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer's Signature
Customer's Signature
(To confirm satisfactory demonstration and receipt of manufacturer's literature)
*
All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme.
A Building Regulations Compliance Certificate will then be issued to the customer.
62
c
Heating and Hotwater Industry Council (HHIC)
Room Thermostat and
Programmer/Timer
:
Measure and Record
Measure and Record

GAS BOILER SYSTEM COMMISSIONING CHECKLIST

Telephone Number
Gas Safe Register Number
Telephone Number
Commissioning Date
Programmable
Room Thermostat
Cylinder Thermostat and Programmer/Timer
3
m /hr
mbar
3
m /hr
OR
mbar
Gas Inlet Pressure (at maximum rate)
OR
CO
%
OR
CO
2
Optimum Start
Load/Weather
Compensation
Combination Boiler
Fitted
Not Required
Fitted
Not Required
Fitted
Not Required
Fitted
Not Required
Provided
Quantity
OR
OR
Gas Inlet Pressure
Yes
Yes
Yes
Temperature
ppm
OR
CO/CO
Ratio
2
www.centralheating.co.uk
Control
Yes
litres
3
ft /hr
mbar
°C
°C
No
No
3
ft /hr
mbar
°C
°C
l/min
Yes
Yes
Yes
Yes
Yes
Yes