Transceiver Unit - Furuno FCV-30 Installation Manual

Color sounder
Hide thumbs Also See for FCV-30:
Table of Contents

Advertisement

1. MOUNTING
1.3

Transceiver Unit

The transceiver unit is designed to be mounted on the deck. Select a mounting location
considering the points below.
• The transceiver unit generates heat so the mounting location should be well ventilated
and dry.
• The unit is only designed for deck mounting.
• Secure the maintenance space "#" shown in the figure below for ease of maintenance
and service.
• For the CV-302-MS (transceiver unit with motion sensor), install it horizontally in the
location where the ambient temperature is lower than 45°C. If the front panel of the unit is
oriented to port, its motion sensor faces the bow, i.e., the arrow mark on the NOTE label on
the transceiver unit orients to bow. After installation, compensate for installation angle error,
referring to chapter 3.
If necessary, install a channel base on the mounting location, consulting with the shipyard.
Fasten the transceiver unit to the channel base with M12 bolts. If necessary, reinforce the
transceiver unit against vibration by stays extending from the eyebolts.
Eye bolt
(4 pcs.)
Cable clamp
Terminal board
#300
Cable clamp
Terminal board
Channel base
(Shipyard supply)
Fixing holes
φ
4-
14
Ground terminal
410±1
#300
446
365
POWER
FUSE
Ground terminal
(460)
Cable entry (Channel base)
(410±1)
(4-M12-6H)
(Fixing holes of
Transceiver unit)
(170)
Channel base
Channel base & Deck side cable entry
99
Cable entry
(380)
4
(30)
Deck side cable entry
(100) (80)
(5)

Advertisement

Table of Contents
loading

Table of Contents